I work in Romania and I work as a Material Handler at a factory. My job is easy on paper. I take a walk around the assembly line and order the materials needed from the warehouse. Recently I was tasked with the packing area. Here is the thing, the factory works in 3 shifts while I’m working from 9-17pm because I come from outside the city from a village and this was the only timeframe that worked, anyway my supervisor came and told me that from now on I’m the only one who is working on that area and I shell keep the shelves full with packing boxes, inserts and supplies so that the 2nd and 3rd shifts will not have to deal with the area and so it would last ‘till I return. Basically work for 3 shifts (24h). That area is used for a total of 12 clients and it had to be supplied 2 times per shift. So there is no way this can work.